The first move in installing vinyl plank flooring over concrete is to determine the area that needs to be covered.
Applying vinyl flooring over concrete.
There are four different types of vinyl plank flooring that you can find on the.
Today i m sharing some tips tools and tricks to installing vinyl plank over concrete.
This is the second time we ve done our concrete basement using vinyl plank flooring see the last place here and this time it went so much smoother.
If the planks are cut make sure the cut edge is facing the wall.
Any minor bumps can be removed with a masonry chisel and small sledgehammer.
Wait for the cracks to dry then fill them with a concrete filler.
Vinyl plank flooring is water resistant and if it has a wpc core it s waterproof so it won t be damaged by the off gassing.
And then baseboard is another leap forward it s so exciting.
This is the newest product in the market.
Lay the first row of vinyl plank flooring along the wall leaving the manufacturer recommended amount of expansion space between the plank s edge and the wall usually about 1 4 inch.
Repair any holes or cracks.
After working out the area you need to find oua retailer who offers cheap vinyl plank flooring.
Wpc vinyl plank flooring.
Then use a level to find any spots where the ground is uneven and apply concrete self leveling compound to even it out.
Your floor must be as smooth and flat as possible for the vinyl.
Mark the floor where the transition strip is to be located taking care to allow for any required expansion space as specified by the flooring manufacturer.
Sheet vinyl can be installed over concrete if the surface of the concrete is clean smooth and dry.
Step 2 apply a 1 4 inch wide line of construction adhesive to the bottom of the transition strip where it will rest on the concrete.
To install vinyl plank flooring on concrete you ll first need to clean the concrete with soap and water and fill in any cracks with concrete filler.
You can lower high spots with a grinder.
Use a tape measure to establish the exact area and add an allowance of 5 square feet for any emergency during the flooring.
Wpc stands for wood plastic composite and itâ s.
Preparing a concrete subfloor for vinyl newly poured concrete off gases water vapor and typically needs from 120 to 150 days to dry out before it s ready to accept flooring according to milliken company.
Scrape off excess with a putty knife and allow the filler to dry.